Source/Archive record (Unpublished document) SKE52886 - EBBSFLEET GREEN (FORMERLY NORTHFLEET WEST SUB-STATION) SOUTHFLEET ROAD EBBSFLEET KENT

Title EBBSFLEET GREEN (FORMERLY NORTHFLEET WEST SUB-STATION) SOUTHFLEET ROAD EBBSFLEET KENT
Author/Originator
Date/Year 2017

Abstract/Summary

post-excavation assessment of Palaeolithic findings from the Ebbsfleet Green site Swanscombe, Kent. There have been a number of phases of archaeological fieldwork undertaken on the site.

External Links (0)

Description

Unpublished document

Location

Kent County Council Heritage 2018/1008

Referenced Monuments (1)

  • Areas of higher Palaeolithic potential within the Ebbsfleet Green Development area (Monument)

Referenced Events (225)

  • EKE14673 A supplementary archaeological assessment. Northfleet West Substation Site, Southfleet Road, Swanscombe
  • EKE14301 Archaeolgical watching brief: Northfleet west substation remediation works, Southfleet Road, Swanscombe, Kent (Ref: 5907)
  • EKE17867 Archaeological evaluation (strip, map & sample) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014
  • EKE14062 Archaeological evaluation (strip, map & sample) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014
  • EKE17957 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 534 (Ref: KT-SFL03)
  • EKE17958 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 535 (Ref: KT-SFL03)
  • EKE17959 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 536 (Ref: KT-SFL03)
  • EKE17960 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 537 (Ref: KT-SFL03)
  • EKE17961 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 538 (Ref: KT-SFL03)
  • EKE17962 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 539 (Ref: KT-SFL03)
  • EKE17963 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 540 (Ref: KT-SFL03)
  • EKE17964 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 541 (Ref: KT-SFL03)
  • EKE17965 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 542 (Ref: KT-SFL03)
  • EKE17966 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 543 (Ref: KT-SFL03)
  • EKE17967 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 544 (Ref: KT-SFL03)
  • EKE17968 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 545 (Ref: KT-SFL03)
  • EKE17969 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 546 (Ref: KT-SFL03)
  • EKE17970 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 547 (Ref: KT-SFL03)
  • EKE17971 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 548 (Ref: KT-SFL03)
  • EKE17972 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 549 (Ref: KT-SFL03)
  • EKE17973 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 550 (Ref: KT-SFL03)
  • EKE17974 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 551 (Ref: KT-SFL03)
  • EKE17975 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 552 (Ref: KT-SFL03)
  • EKE17976 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 553 (Ref: KT-SFL03)
  • EKE17977 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 554 (Ref: KT-SFL03)
  • EKE17978 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 555 (Ref: KT-SFL03)
  • EKE17979 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 556 (Ref: KT-SFL03)
  • EKE17980 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 557 (Ref: KT-SFL03)
  • EKE17981 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 558 (Ref: KT-SFL03)
  • EKE17982 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 559 (Ref: KT-SFL03)
  • EKE17983 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 560 (Ref: KT-SFL03)
  • EKE17984 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 561 (Ref: KT-SFL03)
  • EKE17985 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 562 (Ref: KT-SFL03)
  • EKE17986 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 563 (Ref: KT-SFL03)
  • EKE17987 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 564 (Ref: KT-SFL03)
  • EKE17988 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 565 (Ref: KT-SFL03)
  • EKE17989 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 566 (Ref: KT-SFL03)
  • EKE17990 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 567 (Ref: KT-SFL03)
  • EKE17991 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 568 (Ref: KT-SFL03)
  • EKE17992 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 569 (Ref: KT-SFL03)
  • EKE17993 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 570 (Ref: KT-SFL03)
  • EKE17994 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 571 (Ref: KT-SFL03)
  • EKE17995 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 572 (Ref: KT-SFL03)
  • EKE17996 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 573 (Ref: KT-SFL03)
  • EKE17997 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 574 (Ref: KT-SFL03)
  • EKE17998 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 575 (Ref: KT-SFL03)
  • EKE17999 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 576 (Ref: KT-SFL03)
  • EKE18000 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 577 (Ref: KT-SFL03)
  • EKE18001 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 578 (Ref: KT-SFL03)
  • EKE18002 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 579 (Ref: KT-SFL03)
  • EKE18003 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 580 (Ref: KT-SFL03)
  • EKE18004 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 581 (Ref: KT-SFL03)
  • EKE18005 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 582 (Ref: KT-SFL03)
  • EKE18006 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 583 (Ref: KT-SFL03)
  • EKE18007 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 584 (Ref: KT-SFL03)
  • EKE18008 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 585 (Ref: KT-SFL03)
  • EKE18009 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 586 (Ref: KT-SFL03)
  • EKE18010 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 587 (Ref: KT-SFL03)
  • EKE18011 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 - Trench 588 (Ref: KT-SFL03)
  • EKE17956 Archaeological evaluation (trial trenching element) at Ebbsfleet Green - Phase 5 (formerly Northfleet West Sub-Station), 2015 (Ref: KT-SFL03)
  • EKE14061 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014
  • EKE17112 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 400
  • EKE17113 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 402
  • EKE17114 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 403
  • EKE17115 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 404
  • EKE17116 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 405
  • EKE17117 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 406
  • EKE17118 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 407
  • EKE17119 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 408
  • EKE17120 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 409
  • EKE17121 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 410
  • EKE17122 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 411
  • EKE17123 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 412
  • EKE17124 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 413
  • EKE17125 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 417
  • EKE17126 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 418
  • EKE17127 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 419
  • EKE17128 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 420
  • EKE17129 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 421
  • EKE17130 Archaeological evaluation (trial trenching element) at Ebbsfleet Green (formerly Northfleet West Sub-Station), 2014 - Tr 422
  • EKE18143 Archaeological watching brief: Northfleet west substation remediation works, Southfleet Road, Swanscombe, Kent (Ref: 5907)
  • EKE17869 Ebbsfleet Green housing development (formerly Northfleet West Sub-station), excavation of Clactonian palaeo-landsurface. (Ref: KTSFL03)
  • EKE16146 Ebbsfleet Green housing development (formerly Northfleet West Sub-station), excavation of Clactonian palaeo-landsurface. (Ref: KTSFL03)
  • EKE17728 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 300 (Ref: KT-SFL03)
  • EKE17729 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 301 (Ref: KT-SFL03)
  • EKE17730 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 302 (Ref: KT-SFL03)
  • EKE17731 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 303 (Ref: KT-SFL03)
  • EKE17732 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 304 (Ref: KT-SFL03)
  • EKE17733 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 305 (Ref: KT-SFL03)
  • EKE17734 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 306 (Ref: KT-SFL03)
  • EKE17735 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 307 (Ref: KT-SFL03)
  • EKE17736 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 308 (Ref: KT-SFL03)
  • EKE17737 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 309 (Ref: KT-SFL03)
  • EKE17738 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 310 (Ref: KT-SFL03)
  • EKE17739 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 311 (Ref: KT-SFL03)
  • EKE17740 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 312 (Ref: KT-SFL03)
  • EKE17741 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 313 (Ref: KT-SFL03)
  • EKE17742 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 314 (Ref: KT-SFL03)
  • EKE17743 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 - Trench 315 (Ref: KT-SFL03)
  • EKE14064 Geoarchaeological evaluation at Northfleet West substation (trial trenching, phase 3), 2010 (Ref: KT-SFL03)
  • EKE17630 Historic Environment Framework: Ebbsfleet Green, Southfleet Road, Swanscombe
  • EKE17404 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 101 (Ref: KT-SFL03)
  • EKE17405 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 102 (Ref: KT-SFL03)
  • EKE17406 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 103 (Ref: KT-SFL03)
  • EKE17407 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 105 (Ref: KT-SFL03)
  • EKE17408 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 106 (Ref: KT-SFL03)
  • EKE17409 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 107 (Ref: KT-SFL03)
  • EKE17410 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 108 (Ref: KT-SFL03)
  • EKE17411 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 109 (Ref: KT-SFL03)
  • EKE17412 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 111 (Ref: KT-SFL03)
  • EKE17413 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 112 (Ref: KT-SFL03)
  • EKE17414 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 113 (Ref: KT-SFL03)
  • EKE17415 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 114 (Ref: KT-SFL03)
  • EKE17416 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Borehole 115 (Ref: KT-SFL03)
  • EKE17419 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 101 (Ref: KT-SFL03)
  • EKE17420 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 102 (Ref: KT-SFL03)
  • EKE17421 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 103 (Ref: KT-SFL03)
  • EKE17422 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 104 (Ref: KT-SFL03)
  • EKE17423 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 105 (Ref: KT-SFL03)
  • EKE17424 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 106 (Ref: KT-SFL03)
  • EKE17425 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 107 (Ref: KT-SFL03)
  • EKE17426 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 108 (Ref: KT-SFL03)
  • EKE17427 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 109 (Ref: KT-SFL03)
  • EKE17428 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 110 (Ref: KT-SFL03)
  • EKE17429 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 111 (Ref: KT-SFL03)
  • EKE17430 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 112 (Ref: KT-SFL03)
  • EKE17431 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 113 (Ref: KT-SFL03)
  • EKE17432 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 114 (Ref: KT-SFL03)
  • EKE17433 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 115 (Ref: KT-SFL03)
  • EKE17434 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 116 (Ref: KT-SFL03)
  • EKE17435 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 117 (Ref: KT-SFL03)
  • EKE17436 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 118 (Ref: KT-SFL03)
  • EKE17437 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 119 (Ref: KT-SFL03)
  • EKE17438 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 120 (Ref: KT-SFL03)
  • EKE17439 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 121 (Ref: KT-SFL03)
  • EKE17440 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 122 (Ref: KT-SFL03)
  • EKE17441 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 123 (Ref: KT-SFL03)
  • EKE17442 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 124 (Ref: KT-SFL03)
  • EKE17443 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 125 (Ref: KT-SFL03)
  • EKE17444 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 126 (Ref: KT-SFL03)
  • EKE17445 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 127 (Ref: KT-SFL03)
  • EKE17446 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 128 (Ref: KT-SFL03)
  • EKE17447 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 129 (Ref: KT-SFL03)
  • EKE17448 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 130 (Ref: KT-SFL03)
  • EKE17449 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 131 (Ref: KT-SFL03)
  • EKE17450 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 132 (Ref: KT-SFL03)
  • EKE17451 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 133 (Ref: KT-SFL03)
  • EKE17452 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 - Geotechnical test pit 135 (Ref: KT-SFL03)
  • EKE14066 Phase 1 of an evaluation at Northfleet West substation, 2009-2010 (Ref: KT-SFL03)
  • EKE14067 Phase 2 of an evaluation at Northfleet West substation, 2009-2010
  • EKE17469 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 100
  • EKE17470 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 101
  • EKE17471 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 102
  • EKE17472 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 103
  • EKE17473 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 104
  • EKE17474 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 105
  • EKE17475 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 106
  • EKE17476 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 107
  • EKE17477 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 108
  • EKE17478 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 109
  • EKE17479 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 110
  • EKE17480 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 111
  • EKE17481 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 112
  • EKE17482 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 113
  • EKE17483 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 114
  • EKE17484 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 115
  • EKE17485 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 116
  • EKE17486 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 117
  • EKE17487 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 118
  • EKE17488 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 119
  • EKE17489 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 121
  • EKE17490 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 122
  • EKE17491 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 123
  • EKE17492 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 124
  • EKE17493 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 125
  • EKE17494 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 126
  • EKE17495 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 127
  • EKE17496 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 128
  • EKE17497 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 129
  • EKE17498 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 130
  • EKE17498 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 130
  • EKE17499 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 131
  • EKE17500 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 132
  • EKE17501 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 133
  • EKE17502 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 134
  • EKE17503 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 135
  • EKE17504 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 136
  • EKE17505 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 137
  • EKE17506 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 138
  • EKE17507 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 139
  • EKE17508 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 140
  • EKE17509 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 141
  • EKE17510 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 142
  • EKE17511 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 143
  • EKE17512 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 144
  • EKE17513 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 145
  • EKE17514 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 146
  • EKE17515 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 147
  • EKE17516 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 148
  • EKE17517 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 149
  • EKE17518 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 150
  • EKE17519 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 151
  • EKE17520 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 152
  • EKE17521 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 153
  • EKE17522 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 154
  • EKE17523 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 155
  • EKE17524 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 156
  • EKE17525 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 157
  • EKE17526 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 158
  • EKE17527 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 159
  • EKE17528 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 160
  • EKE17529 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 161
  • EKE17530 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 162
  • EKE17531 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 163
  • EKE17532 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 164
  • EKE17533 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 165
  • EKE17534 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 166
  • EKE17535 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 167
  • EKE17536 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 168
  • EKE17537 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 169
  • EKE17538 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 170
  • EKE17539 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 171
  • EKE17540 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 172
  • EKE17541 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 173
  • EKE17542 Phase 2 of an evaluation at Northfleet West substation, 2009-2010 - Window Sample 174

Record last edited

Nov 26 2020 5:02PM